- 1. Understanding modern SD-WAN capabilities and options
- 2. What is SD-WAN?
- 3. Types of SD-WAN management models
- 4. DIY SD-WAN
- 5. Fully managed SD-WAN
- 6. Co-managed SD-WAN, aka Hybrid
- 7. Managed CPE SD-WAN
- 8. SD-WAN as a Service (SD-WANaaS)
- 9. Types of SD-WAN deployment architectures
- 10. Hub-and-spoke
- 11. Mesh
- 12. Hybrid mesh
- 13. Types of SD-WAN deployment environments
- 14. On-premises SD-WAN
- 15. Cloud-based SD-WAN
- 16. Hybrid SD-WAN
- 17. How to choose the right SD-WAN deployment option for your business
- 18. SD-WAN deployment models FAQs
- Understanding modern SD-WAN capabilities and options
- What is SD-WAN?
- Types of SD-WAN management models
- DIY SD-WAN
- Fully managed SD-WAN
- Co-managed SD-WAN, aka Hybrid
- Managed CPE SD-WAN
- SD-WAN as a Service (SD-WANaaS)
- Types of SD-WAN deployment architectures
- Hub-and-spoke
- Mesh
- Hybrid mesh
- Types of SD-WAN deployment environments
- On-premises SD-WAN
- Cloud-based SD-WAN
- Hybrid SD-WAN
- How to choose the right SD-WAN deployment option for your business
- SD-WAN deployment models FAQs
Types of SD-WAN Deployment Models: A Complete Guide
- Understanding modern SD-WAN capabilities and options
- What is SD-WAN?
- Types of SD-WAN management models
- DIY SD-WAN
- Fully managed SD-WAN
- Co-managed SD-WAN, aka Hybrid
- Managed CPE SD-WAN
- SD-WAN as a Service (SD-WANaaS)
- Types of SD-WAN deployment architectures
- Hub-and-spoke
- Mesh
- Hybrid mesh
- Types of SD-WAN deployment environments
- On-premises SD-WAN
- Cloud-based SD-WAN
- Hybrid SD-WAN
- How to choose the right SD-WAN deployment option for your business
- SD-WAN deployment models FAQs
There are three primary options for deploying SD-WAN, including DIY, fully managed, and co-managed (hybrid). Additional SD-WAN deployment models include managed CPE and SD-WANaaS.
- DIY SD-WAN: Managed and configured internally
- Fully managed SD-WAN: Handled by a service provider
- Co-managed (hybrid) SD-WAN: Blends internal control with external expertise
- Managed CPE SD-WAN: Outsources on-site hardware management
- SD-WANaaS: Cloud-based third-party management and delivery
Understanding modern SD-WAN capabilities and options
Since its inception, SD-WAN has remained a modern networking technology cornerstone. As SD-WAN technology has evolved, so have its capabilities and deployment methods.
Advancements in technology have led to the emergence of multiple types of SD-WAN options. However, the broad range of terms and options can get confusing.
A common way to categorize SD-WAN deployment models is by management model, network architecture, and deployment environments.
Typically the term “SD-WAN deployment models” refers to SD-WAN management models, which is what we’ll be focusing on for the purposes of this article. However, we’ll still touch on SD-WAN architectures and environments to be thorough.
What is SD-WAN?
Software-defined wide area network (SD-WAN) is a modern approach to managing and optimizing wide area networks (WANs).
It applies software-defined networking (SDN) principles to provide centralized control over network traffic and resources. Which makes it easier to manage and scale connectivity across multiple locations.
Here’s how SD-WAN works:
SD-WAN uses virtualized network services to connect branch offices, remote locations, and data centers. It combines various connection types, such as broadband, MPLS, and LTE, into a single, cohesive network.
By continuously monitoring the performance of these connections, SD-WAN ensures efficient traffic management and maintains high performance. This means users can access applications and resources seamlessly, no matter where they are.
Like this:
Benefits of SD-WAN include:
- Operational simplicity
- Carrier-independent WAN connectivity and improved ROI
- Improved security
- Enhanced performance
- Improved connectivity and direct cloud access
- Foundation to SASE strategy
And SD-WAN can be applied across numerous use cases:
- Branch connectivity
- Enhanced security
- Centralized management and visibility
- IoT security, connectivity, and performance
- Application control and quality of service
- Cloud connectivity and strategy
Types of SD-WAN management models
Types of SD-WAN management models include:
- DIY SD-WAN
- Fully managed SD-WAN
- co-managed (hybrid) SD-WAN
- Managed CPE SD-WAN
- SD-WANaaS
SD-WAN management models define how an organization oversees and operates its SD-WAN infrastructure. They outline the division of responsibilities between the organization and service providers, affecting everything from setup and maintenance to ongoing management and support.
Each SD-WAN management model impacts control, flexibility, and the level of involvement required from internal IT or network teams. And comes with different implications depending on company size, resources, and specific needs. There are distinct advantages and trade-offs.
If you’re in the beginning stages of evaluating SD-WAN, or even looking to consider an alternative management model, understanding these details is a great place to start.
DIY SD-WAN
What it is: DIY SD-WAN, or Do-it-yourself SD-WAN, involves managing and configuring the SD-WAN infrastructure internally within an organization.
Essentially, this approach allows businesses to take full control of their network, from design to deployment.
With DIY SD-WAN, companies use in-house resources to implement and manage the network. As opposed to relying on external vendors.
How it works: In a DIY SD-WAN setup, organizations typically deploy SD-WAN appliances at each location. These appliances connect to the internet and, if needed, integrate with existing MPLS links.
The network team is usually responsible for setting up, configuring, and maintaining SD-WAN appliances. They also handle traffic management, applying policies to optimize performance and ensure security.
A DIY setup provides flexibility because the organization can customize configurations to fit its specific needs.
Suitable for: DIY SD-WAN tends to work well for larger enterprises with a skilled network team and the resources to manage a complex network environment.
Organizations that already have network expertise and want to maintain complete control over their network might find DIY SD-WAN appealing. It definitely allows way more customization. And potentially reduces costs as a result of leaning on existing resources.
At the same time, this approach does require a significant investment in time and expertise. It may not be the best fit for smaller businesses or those lacking a dedicated IT team.
Overall, DIY SD-WAN offers flexibility and control, but it also demands strong in-house technical capabilities and ongoing management effort.
Fully managed SD-WAN
What it is: Fully managed SD-WAN is a service where an external provider takes responsibility for all aspects of your SD-WAN network.
The fully managed SD-WAN model offers a comprehensive solution, including setup, configuration, monitoring, and ongoing management.
Essentially, the provider handles the entire SD-WAN infrastructure. So your organization can focus on its core activities rather than network management.
How it works: With fully managed SD-WAN, you partner with a managed service provider (MSP) that oversees your SD-WAN network.
The MSP takes care of deploying and configuring the necessary equipment and software at your locations.
They handle all aspects of network operations, including monitoring performance, troubleshooting issues, and ensuring security.
Managed SD-WAN typically includes service level agreements (SLAs) to guarantee performance standards and response times. The overall arrangement simplifies network management by offloading these responsibilities to the provider.
Suitable for: Fully managed SD-WAN is a great option for businesses that lack the internal resources or expertise to manage SD-WAN on their own.
This approach is beneficial for companies seeking to streamline operations, enhance network performance, and ensure robust security—but without the need for extensive internal IT resources.
Fully managed SD-WAN provides a hassle-free way to maintain an efficient network. It’s definitely a practical choice for businesses aiming to simplify network management by counting on expert support.
Further reading: What Is Managed SD-WAN?
Co-managed SD-WAN, aka Hybrid
-
What it is: Co-managed (or hybrid) SD-WAN offers a balanced approach to network management, combining elements of both DIY and fully managed models.
With co-managed SD-WAN, your organization works in tandem with a managed service provider. This setup allows your internal network team to retain some control and visibility over network operations while also relying on the provider’s expertise for complex tasks and routine maintenance.
Note“Hybrid SD-WAN” can be a confusing term because it’s used in different contexts. A hybrid SD-WAN management model is distinct from both a hybrid SD-WAN deployment environment—which combines on-premises and cloud-based elements—and hybrid SD-WAN as a method for combining the distinct capabilities of MPLS and SD-WAN technologies.
-
How it works: In a co-managed SD-WAN model, you and the provider share responsibilities for managing the network.
The provider typically handles the more technical aspects like setup, configuration, proactive monitoring, and troubleshooting. Meanwhile, your internal IT or network team still has control over day-to-day network operations and policy decisions.
This setup allows you to be involved in strategic decisions and adjustments without being bogged down by routine management tasks.
-
Suitable for: Co-managed SD-WAN is a good fit for organizations that have a capable IT and/or network team but want to avoid the burden of handling every aspect of network management.
It’s suitable for businesses that seek a middle ground between complete in-house control and full outsourcing. This model is particularly beneficial for companies that want to stay involved in network operations but need expert support to manage more complex issues.
In essence, co-managed SD-WAN provides a flexible solution that enables businesses to balance control with the benefits of professional expertise. It’s a practical choice for organizations that need both oversight and support to effectively manage their network.
Managed CPE SD-WAN
-
What it is: Managed CPE, or customer premises equipment, is a deployment model where the service provider handles the management of SD-WAN hardware located at your site.
This approach involves outsourcing the care of physical network devices while maintaining some level of control over network operations.
-
How it works: In a managed CPE SD-WAN setup, the service provider is responsible for the installation, configuration, and ongoing management of the SD-WAN equipment at your premises. This includes tasks like monitoring performance, applying updates, and troubleshooting issues.
The provider ensures that the hardware integrates seamlessly with your network and operates efficiently.
-
Suitable for: This model is well-suited for businesses that need physical SD-WAN hardware for reasons like security or compliance but prefer to have the day-to-day management handled by experts.
It’s also a good choice for organizations that want to keep some control over their network infrastructure while offloading the more technical aspects of managing the equipment.
Ultimately, a managed CPE SD-WAN model offers a balance between expert management and localized control.
SD-WAN as a Service (SD-WANaaS)
What it is: SD-WAN as a Service (SD-WANaaS) is a cloud-based model where a third-party provider manages and typically delivers SD-WAN functionalities over the public internet.
Unlike traditional SD-WAN deployments—which may require extensive on-premises hardware and in-house management—SD-WANaaS abstracts much of the complexity. And that allows businesses to manage their networks through a centralized cloud portal.
How it works: In an SD-WANaaS setup, the service provider handles the core infrastructure: network management, performance optimization, and security.
Customers interact with their network through a cloud-based management interface, where they can monitor performance, configure settings, and make adjustments as needed.
The provider takes care of hardware updates, network optimization, and security measures. Similar to managed SD-WAN, this allows businesses to focus on their core operations rather than the intricacies of network management.
Suitable for: SD-WANaaS is a useful choice for businesses that want to simplify network management while avoiding the complexities of maintaining physical hardware.
Organizations with multiple locations or those undergoing rapid growth can benefit from SD-WANaaS thanks to the scalability and flexibility. Companies with limited IT or network resources or those adopting a cloud-first strategy may also find SD-WANaaS appealing.
Using the SD-WANaaS model, businesses can improve network performance, security, and operational efficiency without having to deal with managing the underlying infrastructure themselves.
Further reading: What Is SD-WANaaS? | What It Is, How It Works, Pros & Cons
Types of SD-WAN deployment architectures
Types of SD-WAN deployment architectures include:
- Hub-and-spoke
- Mesh
- Hybrid mesh
Deployment architectures define how network traffic is routed between various locations, influencing performance, scalability, and reliability. An SD-WAN deployment architecture determines the structural layout and connectivity of the network.
Each architecture offers unique benefits and challenges. The SD-WAN architecture determines how data flows through the network and how sites communicate with one another.
Hub-and-spoke
The hub-and-spoke model connects multiple spokes to a central hub.
In a hub-and-spoke setup, the hub, typically a large data center or central node, manages traffic between branch offices and edge sites. All communication flows through this central hub.
The model has two variations:
-
Spoke-to-hub only: Each spoke communicates only with the hub, not with other spokes. This simplifies network management and meets security or regulatory needs for isolation.
-
Spoke-to-spoke via hub: Spokes can communicate with each other, but traffic must pass through the hub first. This keeps management centralized but can introduce latency.
The hub-and-spoke model is easy to deploy and manage, making it suitable for organizations new to SD-WAN.
However, centralizing traffic can create bottlenecks and potential points of failure. If the hub fails, all spokes might lose network connectivity. Hubs can also become targets for cyber threats.
Mesh
The mesh SD-WAN deployment form differs from traditional centralized models by allowing direct communication between branch offices, campuses, and edge sites without routing traffic through a central hub.
In a full mesh deployment, every site connects directly through overlay tunnels, enabling any-to-any communication.
Like so:
This setup speeds up data transfers and supports edge computing by placing applications and services closer to data sources. It also reduces the risk of outages since there are no single points of failure.
However, full mesh networks can be complex to implement because they require each site to manage its own networking and security solutions. Which does increase the potential for configuration errors and management challenges.
A partial mesh deployment allows some direct site-to-site communication while still relying on central hubs for certain traffic.
Here’s what it looks like:
This model balances performance and efficiency by decentralizing some services.
On the other hand, it doesn’t totally eliminate the bottlenecks or security risks associated with centralized hubs.
Hybrid mesh
The hybrid mesh SD-WAN deployment model blends hub-and-spoke and full mesh architectures. It routes some traffic through central hubs while allowing other traffic to travel directly between sites. This setup balances centralized control with decentralized communication flexibility.
In a hybrid mesh, multiple hubs are used rather than a single central hub. Spoke sites connect to these hubs but don’t communicate directly with each other.
Traffic between spoke sites passes through the hubs, preventing any single hub from becoming a single point of failure. This distribution improves performance and reduces bottlenecks.
The hybrid mesh model offers redundancy and load balancing, which enhances network reliability and simplifies management compared to a full mesh.
However, it still depends on centralized hubs, which can be targets for cyber threats and may cause performance issues if they become unavailable.
Types of SD-WAN deployment environments
Types of SD-WAN deployment environments include:
- On-premises SD-WAN
- Cloud-based SD-WAN
- Hybrid SD-WAN
An SD-WAN deployment environment refers to where and how an organization implements and operates SD-WAN infrastructure. This concept focuses on the physical or virtual location of the network components and how they’re integrated into an organization's existing infrastructure.
Deployment environments influence decision making factors like control, flexibility, scalability, and SD-WAN costs. Each offers different advantages and limitations that influence how organizations manage network resources and scale operations.
On-premises SD-WAN
On-premises SD-WAN involves installing SD-WAN hardware and software at a company’s own facilities, such as data centers or branch offices. This model offers direct control over the SD-WAN infrastructure, and there’s plenty of room allowing for customization around specific needs.
The main advantage of on-premises SD-WAN is enhanced security since the hardware and data stay within the organization's facilities. It also provides more predictable performance because it’s not dependent on external service providers.
However, on-premises SD-WAN can be expensive. And complex to manage. Organizations may face significant upfront costs for hardware, licenses, and maintenance. Plus, you’ll need a dedicated network team to handle configurations and technical issues.
Cloud-based SD-WAN
Cloud-based SD-WAN is a deployment model where the SD-WAN infrastructure is hosted and managed in the cloud. This means that instead of installing hardware and software on-site, companies rely on providers to deliver and manage the SD-WAN services.
The SD-WAN functionalities are accessed over the internet, connecting branch offices, data centers, and cloud-based applications through virtual SD-WAN gateways in the cloud.
One of the main advantages of cloud-based SD-WAN is flexibility. Since the infrastructure is managed by a cloud provider, organizations can scale their network quickly to accommodate changing business needs.
For example: Adding new sites or increasing bandwidth can be done with minimal physical setup and configuration.
The cloud-based SD-WAN model also supports a pay-as-you-go pricing structure. So companies only pay for the resources they use. And that can be more cost-effective than maintaining on-premises equipment (though not always).
However, cloud-based SD-WAN does come with some considerations.
Reliance on the internet means that network performance is contingent on the quality of the internet connection. If there are issues with network connectivity or if the provider experiences downtime, it can impact the performance and availability of the SD-WAN. Plus, while cloud-based SD-WAN can reduce the need for physical infrastructure, it still requires careful management to ensure security and compliance—especially with sensitive data.
Hybrid SD-WAN
A hybrid SD-WAN deployment environment combines on-premises and cloud-based elements to blend local control with cloud flexibility. This setup uses on-site hardware for critical network components and cloud services for broader network connectivity and scalability.
The advantages of a hybrid SD-WAN deployment environment include maintaining control over sensitive parts of the network while benefiting from cloud resources' scalability and cost-effectiveness. Companies can customize their setup to meet specific needs, using on-premises equipment where necessary and cloud services to expand capabilities.
However, hybrid SD-WAN can be complex. It definitely requires careful coordination between on-premises and cloud components. And managing and integrating different infrastructures may increase operational overhead.
Further reading:
- What Is SD-Branch?
- What Is SD-WAN Multicloud?
- What Is the Cloud-delivered Branch?
- What Is Next-Generation SD-WAN?
How to choose the right SD-WAN deployment option for your business
As noted, for the purposes of this article, we’ll focus on SD-WAN management models.
Selecting the right SD-WAN deployment option for your business involves evaluating several key factors.
Here’s a step-by-step guide to help you determine which option aligns best with your needs:
Step 1: Assess your internal capabilities
First, consider the expertise and resources available within your organization.
Do you have a skilled IT team capable of managing and maintaining a complex network infrastructure?
If your team lacks the necessary skills or time, a fully managed or co-managed SD-WAN might be more suitable. On the other hand, if you have a robust IT and/or network department and can allocate resources to network administration and management, a DIY model could be a viable option.
Step 2: Evaluate your long-term goals
Next, think about your long-term objectives.
Are flexibility and control critical to your business strategy?
If so, a DIY or co-managed SD-WAN model might better serve your needs. Both offer more customization and control over your network. Conversely, if you prefer focusing on core business activities rather than managing network infrastructure, a fully managed SD-WAN might be a better fit.
Step 3: Consider your network complexity
Consider the complexity of your network.
Does your network involve multiple global locations or critical applications that require sophisticated management?
If your network needs are complex, a fully managed SD-WAN or co-managed approach could provide the necessary support and expertise. DIY models might be suitable for less complex networks where in-house network administration and management is feasible, or for organizations who have plenty of dedicated SD-WAN expertise.
Step 4: Review your resource allocation
Assess how much time and resources you can dedicate to network administration and management.
A DIY approach requires substantial investment in terms of time, expertise, and ongoing management.
If your business prefers to avoid the overhead associated with these tasks, a fully managed or co-managed model might be more appropriate. These models outsource most of the network management.
Step 5: Examine your cloud and SaaS dependencies
Determine how reliant your infrastructure is on cloud services or SaaS applications.
If your business heavily relies on these services, a deployment model that integrates well with cloud environments, like SD-WAN-as-a-Service (SD-WANaaS), may be beneficial.
SD-WANaaS provides flexibility and scalability, which can enhance performance and integration with cloud-based resources.
Step 6: Assess security and compliance needs
Consider your security and compliance requirements.
Do you have strict policies that mandate in-house management for security reasons?
If so, a DIY or co-managed model might be. Managed models can offer robust security features but might not meet specific compliance needs as effectively as in-house management.
Step 7: Analyze your implementation timeline
Think about your timeline for SD-WAN implementation.
Some models, like SD-WANaaS, offer quicker deployment due to their cloud-based nature. If you’re targeting a swift SD-WAN implementation, this model might be advantageous. If you’ve budgeted plenty of time for deployment and want greater control, DIY or co-managed options might be more suitable.
Step 8: Identify key stakeholders
Finally, identify the key stakeholders who need to be involved in the decision-making process.
Ensure their preferences and requirements align with the chosen deployment model.
For instance, if IT leadership prefers a hands-on approach, a DIY or co-managed model might be preferred. If the focus is on minimizing internal management, a fully managed or SD-WANaaS model might be more appropriate.
SD-WAN deployment models FAQs
SD-WAN can be deployed through physical appliances installed at branch offices, virtual appliances in cloud environments, or a combination of both, depending on the organization's needs and infrastructure.
The three basic types of SD-WAN deployments on the market are: DIY (organizations set up and manage the SD-WAN solution themselves), fully managed (a service provider manages the SD-WAN solution on behalf of the organization), and co-managed (a collaborative approach where both the organization and the service provider share management responsibilities).